295 AVENUE over RELIEF
068421404 · County 071, Iowa · Built 1961 · 2 Lanes · 21 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
3
Serious
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 3 | Serious |
Location
40.709456, -95.62755
This bridge is in worse condition than 90.5% of bridges in County 071. The average bridge in Iowa is 0 years old; this one is 65 years old.
Nearby Bridges
295 AVENUE over SLIPPERY ELM HOLLOW
Built 1966
FM over SLIPPERY ELM HOLLOW CRK
Built 1985
US 275 & IA 2 over STREAM
Built 1962
250 STREET over W NISHWABOTNA RIVER
Built 1975
IA 2 US 275 over DRAINAGE
Built 2006
250 STREET over NISHNA RIVER OVERFLOW
Built 1975
250 STREET over E NISHNABOTNA RIVER
Built 1975
IA 2 over W NISHNABOTNA RIVER OVFL
Built 1953
215 STREET over MINOR DRAINAGE
Built 1971
IA 2 over WEST NISHNABOTNA RIVER
Built 1954
Bridge Details
- Structure #
- 000000000159510
- Year Built
- 1961
- Length
- 7.3 m (24 ft)
- Max Span
- 7 m
- Width
- 6.1 m (20 ft)
- Lanes
- 2
- Daily Traffic
- 21
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $160,000
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.