FM 450TH ST over BEAR CREEK

093412401 · County 035, Iowa · Built 1966 · 2 Lanes · 319 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000109810
Year Built
1966
Length
23.5 m (77.1 ft)
Max Span
8.8 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
319
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$726,000
Total Project Cost
$1,089,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.