M21 W AVE over BRANCH MAPLE RIVER

092390202 · County 035, Iowa · Built 2019 · 2 Lanes · 190 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000000108691
Year Built
2019
Length
15.5 m (50.9 ft)
Max Span
15.2 m
Width
9.7 m (31.8 ft)
Lanes
2
Daily Traffic
190
Material
Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.