FM 570TH ST over WILLOW CREEK

091411901 · County 035, Iowa · Built 1979 · 2 Lanes · 100 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
000000000108401
Year Built
1979
Length
17.4 m (57.1 ft)
Max Span
16.8 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
100
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$534,000
Total Project Cost
$802,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.