FM 590TH ST. over PITCHER CREEK

091393501 · County 035, Iowa · Built 1924 · 2 Lanes · 5 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
5
Fair
Substructure
4
Poor

Bridge Details

Structure #
000000000108000
Year Built
1924
Length
10.1 m (33.1 ft)
Max Span
9.8 m
Width
5.5 m (18 ft)
Lanes
2
Daily Traffic
5
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$370,000
Total Project Cost
$554,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.