LOCAL over DRAINAGE DITCH 9-13
088321701 · County 025, Iowa · Built 1983 · 2 Lanes · 11 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
42.442442, -94.608578
This bridge is in worse condition than 25.8% of bridges in County 025. The average bridge in Iowa is 0 years old; this one is 43 years old.
Bridge Details
- Structure #
- 000000000091911
- Year Built
- 1983
- Length
- 23.8 m (78.1 ft)
- Max Span
- 8.8 m
- Width
- 9.8 m (32.2 ft)
- Lanes
- 2
- Daily Traffic
- 11
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $20,000
- Total Project Cost
- $30,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.