340TH ST over STREAM

086340101 · County 025, Iowa · Built 2023 · 2 Lanes · 20 vehicles/day

Overall
Good
Culvert
9
Excellent

Bridge Details

Structure #
000000000090641
Year Built
2023
Length
10.4 m (34.1 ft)
Max Span
4.9 m
Lanes
2
Daily Traffic
20
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$20,000
Total Project Cost
$30,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.