FM over BOYLAN CREEK

092181001 · County 023, Iowa · Built 1967 · 2 Lanes · 29 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
5
Fair
Substructure
4
Poor

Bridge Details

Structure #
000000000088920
Year Built
1967
Length
23.5 m (77.1 ft)
Max Span
8.8 m
Width
8 m (26.2 ft)
Lanes
2
Daily Traffic
29
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$150,000
Total Project Cost
$170,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.