CEDAR AVE over BEAVER CREEK

0.5 Mi North of 335th · County 023, Iowa · Built 2023 · 2 Lanes · 39 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Condition Ratings

ComponentRatingDescription
Deck 9 Excellent
Superstructure 9 Excellent
Substructure 9 Excellent

Location

42.572658, -92.986689

This bridge is in worse condition than 13.9% of bridges in County 023. The average bridge in Iowa is 0 years old; this one is 3 years old.

Nearby Bridges

Bridge Details

Structure #
000000000087371
Year Built
2023
Length
46.6 m (152.9 ft)
Max Span
18 m
Width
10.1 m (33.1 ft)
Lanes
2
Daily Traffic
39
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$970,000,000
Total Project Cost
$985,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.