30TH AVE over BR MAPLE RIVER

090382102 · County 021, Iowa · Built 2005 · 2 Lanes · 30 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
000000000084761
Year Built
2005
Length
9.8 m (32.2 ft)
Max Span
4.9 m
Lanes
2
Daily Traffic
30
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$15,000
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.