SMITHFIELD DRIVE over BRANCH YELLOW RIVER

096050905 · County 005, Iowa · Built 2021 · 2 Lanes · 59 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000000061291
Year Built
2021
Length
70.3 m (230.6 ft)
Max Span
24.8 m
Width
10.1 m (33.1 ft)
Lanes
2
Daily Traffic
59
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.