FM-150TH STREET over E FORK E NODAWAY RIVER

733332 · County 003, Iowa · Built 2008 · 2 Lanes · 399 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
000000000060511
Year Built
2008
Length
40.5 m (132.9 ft)
Max Span
15.5 m
Width
10.1 m (33.1 ft)
Lanes
2
Daily Traffic
399
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$20,000
Total Project Cost
$30,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.