ADAMS-ADAIR ST over STREAM
073320303 · County 003, Iowa · Built 1960 · 2 Lanes · 5 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
0
Failed
Superstructure
0
Failed
Substructure
0
Failed
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 0 | Failed |
| Superstructure | 0 | Failed |
| Substructure | 0 | Failed |
Location
41.157711, -94.514622
This bridge is in worse condition than 95.7% of bridges in County 003. The average bridge in Iowa is 0 years old; this one is 66 years old.
Nearby Bridges
FM over STREAM
Built 1950
330TH ST over STREAM
Built 2021
LOCAL over SHANGHAR CREEK
Built 2009
FM-110TH STREET over SHANGHAI CREEK
Built 1940
UBAN AVENUE over STREAM
Built 1950
LOCAL over SHANGHAR CREEK
Built 2009
330TH ST over STREAM
Built 2015
H20 110TH STREET over EAST NODAWAY RIVER
Built 1980
ADAIR-ADAMS ST over EAST NODAWAY RIVER
Built 1960
JORDAN AVE over SHANGHAR CREEK BRANCH
Built 2009
Bridge Details
- Structure #
- 000000000060330
- Year Built
- 1960
- Length
- 9.1 m (29.9 ft)
- Max Span
- 8.5 m
- Width
- 5.2 m (17.1 ft)
- Lanes
- 2
- Daily Traffic
- 5
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $253,000
- Total Project Cost
- $380,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.