G15 130TH ST over NORTH RIVER
1.6 mi W of P28 on G15 · County 001, Iowa · Built 2024 · 2 Lanes · 132 vehicles/day
Overall
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 9 | Excellent |
| Superstructure | 9 | Excellent |
| Substructure | 9 | Excellent |
Location
41.460531, -94.348981
This bridge is in worse condition than 12.9% of bridges in County 001. The average bridge in Iowa is 0 years old; this one is 2 years old.
Nearby Bridges
SHELDON AVE over NORTH RIVER
Built 2020
140TH ST over STREAM
Built 2016
TRENTON AVE over NORTH RIVER
Built 2016
RIVERSIDE AVE over NORTH RIVER
Built 2023
150TH ST over STREAM
Built 2016
P28 STUART ST over CREEK
Built 1977
LOCAL over STREAM
Built 1938
LOCAL RD over SMALL STREAM
Built 2004
FM over PLUNGER CREEK
Built 1963
TRENTON AVE over I-80
Built 1958
Bridge Details
- Structure #
- 000000000057531
- Year Built
- 2024
- Length
- 30.8 m (101 ft)
- Max Span
- 11.9 m
- Width
- 10.1 m (33.1 ft)
- Lanes
- 2
- Daily Traffic
- 132
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.