250TH ST over W FORK NODAWAY RIVER

0.7 mi E of N54 on 250th · County 001, Iowa · Built 2021 · 2 Lanes · 123 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 8 Very Good
Substructure 8 Very Good

Location

41.287503, -94.628953

This bridge is in worse condition than 13.9% of bridges in County 001. The average bridge in Iowa is 0 years old; this one is 5 years old.

Nearby Bridges

Bridge Details

Structure #
000000000056371
Year Built
2021
Length
69.9 m (229.3 ft)
Max Span
24.8 m
Width
8.3 m (27.2 ft)
Lanes
2
Daily Traffic
123
Material
Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.