I 35 SB over SOUTH SKUNK RIVER

2.6 MI. S OF Jct. U.S. 30 · County 169, Iowa · Built 2017 · 2 Lanes · 23,300 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000000049191
Year Built
2017
Length
115.1 m (377.6 ft)
Max Span
32.5 m
Width
19.3 m (63.3 ft)
Lanes
2
Daily Traffic
23,300
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.