CORA ST over ELK CREEK
020000515 · County 165, Iowa · Built 2019 · 2 Lanes · 396 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
41.791797, -95.213117
This bridge is in worse condition than 10.6% of bridges in County 165. The average bridge in Iowa is 0 years old; this one is 7 years old.
Nearby Bridges
FM over WEST NISHNABOTNA RIVER
Built 1969
FM over W NISHNABOTNA RIVER
Built 1960
FM over ELK CREEK
Built 2005
F24 over SMALL STREAM
Built 1937
2200TH ST over ELK CREEK
Built 2016
LOCAL over STREAM
Built 1996
LOCAL over GREELEY CREEK
Built 1993
FM RD M56 over SMALL STREAM
Built 1989
LOCAL over ELK CREEK
Built 1960
LOCAL over W. NISHNABOTNA
Built 1926
Bridge Details
- Structure #
- 000000000047931
- Year Built
- 2019
- Length
- 43.2 m (141.7 ft)
- Max Span
- 15.9 m
- Width
- 10.1 m (33.1 ft)
- Lanes
- 2
- Daily Traffic
- 396
- Material
- Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $800,000,000
- Total Project Cost
- $810,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.