I 29 over DRAINAGE DITCH

0.5 miles south I-880 · County 155, Iowa · Built 2022 · 2 Lanes · 20,600 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
000000000045011
Year Built
2022
Length
7.3 m (24 ft)
Max Span
3 m
Lanes
2
Daily Traffic
20,600
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.