IA 92 over MIDDLE SILVER CREEK

0.2 MI. E of W JCT SR L55 · County 155, Iowa · Built 2009 · 2 Lanes · 4,940 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000000043831
Year Built
2009
Length
77.7 m (254.9 ft)
Max Span
38.4 m
Width
14.4 m (47.2 ft)
Lanes
2
Daily Traffic
4,940
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.