NE 38TH ST over I 80

1.6 MILES E OF E JCT I-35 · County 153, Iowa · Built 1959 · 2 Lanes · 1,654 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
4
Poor
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000041990
Year Built
1959
Length
69.2 m (227 ft)
Max Span
21 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
1,654
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.