NB I-35 EB I-80 over UP RR

0.5 mi. E of jct. US 69 · County 153, Iowa · Built 2000 · 4 Lanes · 42,300 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000000041671
Year Built
2000
Length
90.8 m (297.9 ft)
Max Span
23.5 m
Width
21.2 m (69.6 ft)
Lanes
4
Daily Traffic
42,300
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.