I 35 NB over UP RR EP TRUE CREEK

1.2 MI. S OF S JCT. I-80 · County 153, Iowa · Built 2014 · 4 Lanes · 36,600 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000000041211
Year Built
2014
Length
136.3 m (447.2 ft)
Max Span
41.8 m
Width
23.9 m (78.4 ft)
Lanes
4
Daily Traffic
36,600
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.