US 75 over DRY CREEK

1.9 mi. N of jct. SR C60 · County 149, Iowa · Built 2023 · 2 Lanes · 14,000 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
000000000039442
Year Built
2023
Length
7.9 m (25.9 ft)
Max Span
3.7 m
Lanes
2
Daily Traffic
14,000
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.