IA 14 over MIDDLE TIMBER CREEK

1.1 MILES N OF JCT SR E63 · County 127, Iowa · Built 1985 · 2 Lanes · 4,250 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000035381
Year Built
1985
Length
37.5 m (123 ft)
Max Span
14.3 m
Width
14.4 m (47.2 ft)
Lanes
2
Daily Traffic
4,250
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.