IA 144 over EAST BUTTRICK CREEK

4.0 MI. S. OF IA 175 · County 073, Iowa · Built 2022 · 2 Lanes · 590 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
000000000025781
Year Built
2022
Length
15.9 m (52.2 ft)
Max Span
3 m
Lanes
2
Daily Traffic
590
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.