US 63 over SOAP CREEK

2.5 MI. N OF JCT. SR J15 · County 051, Iowa · Built 2021 · 2 Lanes

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000000022561
Year Built
2021
Length
104.2 m (341.9 ft)
Max Span
41.8 m
Width
14.4 m (47.2 ft)
Lanes
2
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.