IA 7 over MAPLE CREEK

1.2 mi. E of Jct. IA #3 · County 035, Iowa · Built 1989 · 2 Lanes · 2,020 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000000019481
Year Built
1989
Length
51.8 m (169.9 ft)
Max Span
14.3 m
Width
13.2 m (43.3 ft)
Lanes
2
Daily Traffic
2,020
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.