I 80 WB IA 38 NB over SUGAR CREEK

1.5 MI. W. OF JCT. IA 38 · County 031, Iowa · Built 2024 · 5 Lanes · 18,650 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Condition Ratings

ComponentRatingDescription
Deck 9 Excellent
Superstructure 9 Excellent
Substructure 9 Excellent

Location

41.642586, -91.063333

This bridge is in worse condition than 19.7% of bridges in County 031. The average bridge in Iowa is 0 years old; this one is 2 years old.

Nearby Bridges

Bridge Details

Structure #
000000000018661
Year Built
2024
Length
81.4 m (267.1 ft)
Max Span
37.2 m
Width
24.8 m (81.4 ft)
Lanes
5
Daily Traffic
18,650
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.