US 30 over DITCH #77

1.1 MI. E. OF JCT. US 71 · County 027, Iowa · Built 1919 · 4 Lanes · 13,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
000000000017090
Year Built
1919
Reconstructed
1974
Length
7.6 m (24.9 ft)
Max Span
7.6 m
Width
43.4 m (142.4 ft)
Lanes
4
Daily Traffic
13,000
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.