I-80 over NORTH RIVER

3.1 MI. E OF JCT. IA 25 · County 001, Iowa · Built 1958 · 4 Lanes · 25,900 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
000000000013230
Year Built
1958
Length
17.7 m (58.1 ft)
Max Span
6.4 m
Lanes
4
Daily Traffic
25,900
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.