CLAY ST over MAD CREEK

000000000 · County 139, Iowa · Built 1957 · 2 Lanes · 4,858 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
000000000008440
Year Built
1957
Reconstructed
2010
Length
20.4 m (66.9 ft)
Max Span
19.5 m
Width
14.3 m (46.9 ft)
Lanes
2
Daily Traffic
4,858
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$218,000
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.