1ST ST over DRAINAGE
D60500515 · County 009, Iowa · Built 1930 · 1 Lanes · 9 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
3
Serious
Superstructure
5
Fair
Substructure
2
Critical
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 3 | Serious |
| Superstructure | 5 | Fair |
| Substructure | 2 | Critical |
Location
41.841639, -94.985522
This bridge is in worse condition than 99% of bridges in County 009. The average bridge in Iowa is 0 years old; this one is 96 years old.
Nearby Bridges
MAIN ST over DRAINAGE
Built 1978
GOLDFINCH AVE over CREEK
Built 2021
FM N14 over DRAINAGE DITCH
Built 2002
LOCAL over CREEK
Built 1933
LOCAL over CREEK
Built 1994
LOCAL over CREEK
Built 1997
LOCAL over CREEK
Built 1994
HERON AVE over CREEK
Built 2017
120TH ST over CREEK
Built 1941
140TH ST over CREEK
Built 2013
Bridge Details
- Structure #
- 000000000005650
- Year Built
- 1930
- Length
- 20.1 m (65.9 ft)
- Max Span
- 7 m
- Width
- 5 m (16.4 ft)
- Lanes
- 1
- Daily Traffic
- 9
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $172,000
- Total Project Cost
- $190,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.