R21 E EMERSON ST over CLANTON CREEK

074271100 · County 121, Iowa · Built 2023 · 2 Lanes · 397 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
000000000004411
Year Built
2023
Length
58.5 m (191.9 ft)
Max Span
21 m
Width
10.1 m (33.1 ft)
Lanes
2
Daily Traffic
397
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.