E 32ND ST-PERU over BORDEAUX RUN
N OF LIBERTY ST · County 061, Iowa · Built 1993 · 2 Lanes · 5,395 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
42.528703, -90.680881
This bridge is in worse condition than 45.1% of bridges in County 061. The average bridge in Iowa is 0 years old; this one is 33 years old.
Nearby Bridges
LOUISE LANE over BORDEAUX RUN
Built 2009
W 32ND STREET over BEE BRANCH
Built 2009
WILDWOOD DR over BEE BRANCH
Built 1970
CENTRAL AVE over UNION HOLLOW
Built 1967
S JOHN DEERE RD over SAGEVILLE DRAINAGE DITCH
Built 2002
EAST 22ND ST over BEE BRANCH
Built 2017
ROOSTER LN over SIDE DITCH BRIDGE
Built 1965
RHOMBERG AVE over BEE BRANCH
Built 2017
FENGLER ST over OVER IMRL RR
Built 2002
E 16TH ST over BEE BRANCH
Built 2011
Bridge Details
- Structure #
- 000000000004191
- Year Built
- 1993
- Length
- 10.1 m (33.1 ft)
- Max Span
- 3 m
- Lanes
- 2
- Daily Traffic
- 5,395
- Material
- Concrete
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.