ST JOHNS RD over DRAINAGE
078240700 · County 153, Iowa · Built 1900 · 2 Lanes · 684 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
6
Satisfactory
Superstructure
4
Poor
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 4 | Poor |
| Substructure | 5 | Fair |
Location
41.579503, -93.664006
This bridge is in worse condition than 94% of bridges in County 153. The average bridge in Iowa is 0 years old; this one is 126 years old.
Nearby Bridges
SW 34TH ST over ST JOHNS RD
Built 1982
EB I-235 over 35TH STREET
Built 2004
WB I-235 over 35TH STREET
Built 2005
31ST STREET over I-235
Built 2005
42ND ST SW over I-235
Built 2003
MLK JR PKWY N over RACOON RIVER FLEUR RR
Built 2004
MLK JR PKWY S over RACOON RIVER FLEUR RR
Built 2004
GRAND AVENUE over MLK PKWY
Built 2004
MLK JR PKWY E/W over NB FLEUR RAMP
Built 2004
EB I-235 over 28TH STREET
Built 2004
Bridge Details
- Structure #
- 000000000003715
- Year Built
- 1900
- Length
- 12.2 m (40 ft)
- Max Span
- 6.1 m
- Width
- 12.3 m (40.4 ft)
- Lanes
- 2
- Daily Traffic
- 684
- Material
- Concrete
- Design
- Arch - Deck
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $15,000
- Total Project Cost
- $17,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.