COLLEGE DR over UPPER IOWA RIVER

000000000 · County 191, Iowa · Built 1987 · 4 Lanes · 8,868 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
000000000003541
Year Built
1987
Length
93 m (305.1 ft)
Max Span
25 m
Width
21.5 m (70.5 ft)
Lanes
4
Daily Traffic
8,868
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$1,467,000
Total Project Cost
$1,762,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.