RABER ROAD over GANGWER DRAIN
00.20 N WAIT RD · County 183, Indiana · Built 1995 · 2 Lanes · 500 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
41.113772, -85.437419
This bridge is in worse condition than 45.2% of bridges in County 183. The average bridge in Indiana is 0 years old; this one is 31 years old.
Nearby Bridges
CR 150E over GANGWER DITCH
Built 2003
SR 9 over GANGWER DITCH
Built 1984
CR 200S over EEL RIVER
Built 2022
RABER ROAD over MOWERY DRAIN
Built 2002
KEISER RD over GANGWER DRAIN
Built 2004
RABER RD over EEL RIVER
Built 1954
CR 500E over GANGWER DITCH
Built 1954
BUSINESS 30 over EEL RIVER
Built 1954
CR 150E over MOWERY DRAIN
Built 1930
CR 500E over CFE RR
Built 1994
Bridge Details
- Structure #
- 9200045
- Year Built
- 1995
- Length
- 20.3 m (66.6 ft)
- Max Span
- 18.8 m
- Width
- 8.5 m (27.9 ft)
- Lanes
- 2
- Daily Traffic
- 500
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.