HULMAN Dr over THOMPSON Ditch

00.10 E SR 46 · County 167, Indiana · Built 1992 · 2 Lanes · 3,549 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
8400229
Year Built
1992
Length
8.2 m (26.9 ft)
Max Span
7.9 m
Width
7.8 m (25.6 ft)
Lanes
2
Daily Traffic
3,549
Material
Wood or Timber
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.