TOWPATH Rd over SUGAR Creek

00.30 S of ENGLISH Rd · County 121, Indiana · Built 1964 · 2 Lanes · 454 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
6100147
Year Built
1964
Length
128.6 m (421.9 ft)
Max Span
21.3 m
Width
8.4 m (27.6 ft)
Lanes
2
Daily Traffic
454
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$415,000
Total Project Cost
$603,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.