CR 150 NORTH over BUFFALO CREEK

0.60 N OF CR 75 N · County 117, Indiana · Built 1920 · 2 Lanes · 100 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
5900106
Year Built
1920
Length
7 m (23 ft)
Max Span
6.1 m
Width
5.6 m (18.4 ft)
Lanes
2
Daily Traffic
100
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.