CR 150E over CROFT DITCH

00.43 S OF CR 300 N · County 113, Indiana · Built 1920 · 2 Lanes · 770 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
5
Fair
Substructure
4
Poor

Bridge Details

Structure #
5700015
Year Built
1920
Reconstructed
1973
Length
11.2 m (36.7 ft)
Max Span
10.3 m
Width
6 m (19.7 ft)
Lanes
2
Daily Traffic
770
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$333,000
Total Project Cost
$739,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.