HARRISON ST over PIPE CREEK

00.10 S WATER ST · County 095, Indiana · Built 1973 · 2 Lanes · 1,916 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
4800179
Year Built
1973
Reconstructed
1994
Length
19.2 m (63 ft)
Max Span
18.5 m
Width
14.9 m (48.9 ft)
Lanes
2
Daily Traffic
1,916
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,080,000
Total Project Cost
$1,280,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.