ERIE CHURCH ROAD over S FORK LEATHERWOOD CR

00.53 E OF CR 525 E · County 093, Indiana · Built 1993 · 2 Lanes · 137 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
4700012
Year Built
1993
Length
15.7 m (51.5 ft)
Max Span
7.1 m
Width
6.8 m (22.3 ft)
Lanes
2
Daily Traffic
137
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.