DIVISION ST over ST JOSEPH RIVER

00.10 N SR 120 · County 039, Indiana · Built 1970 · 2 Lanes · 7,436 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
2000007
Year Built
1970
Reconstructed
2005
Length
100.5 m (329.7 ft)
Max Span
20.1 m
Width
12.9 m (42.3 ft)
Lanes
2
Daily Traffic
7,436
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.