CR 100W over MUDDY FORK OF SAND CREEK

00.40 N OF CR 200 N · County 031, Indiana · Built 1899 · 2 Lanes · 210 vehicles/day

Overall
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
1600033
Year Built
1899
Length
12.1 m (39.7 ft)
Max Span
5.4 m
Width
6.3 m (20.7 ft)
Lanes
2
Daily Traffic
210
Material
Masonry
Design
Arch - Deck
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$350,000
Total Project Cost
$760,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.