PERRY ROAD over I-69 NB/SB

4.90 S SR 144 · County 109, Indiana · Built 2020 · 2 Lanes · 1,200 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
080784
Year Built
2020
Length
53.5 m (175.5 ft)
Max Span
26.2 m
Width
11.6 m (38.1 ft)
Lanes
2
Daily Traffic
1,200
Material
Prestressed Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.