SR 3 over TURNOVER CREEK

10.68 N SR 7 · County 031, Indiana · Built 2018 · 2 Lanes · 2,627 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
080757
Year Built
2018
Length
24.1 m (79.1 ft)
Max Span
23.1 m
Width
10.3 m (33.8 ft)
Lanes
2
Daily Traffic
2,627
Material
Prestressed Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.