I-69 NB over CR 600 E BLACK ANKLE CR

05.30 S SR 45 · County 055, Indiana · Built 2014 · 2 Lanes · 2,610 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
080418
Year Built
2014
Length
603.9 m (1981.3 ft)
Max Span
46.6 m
Width
13.2 m (43.3 ft)
Lanes
2
Daily Traffic
2,610
Material
Prestressed Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.