I-69 NB over CR 75 E

00.28 S US 231 · County 055, Indiana · Built 2011 · 3 Lanes · 6,833 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
080346
Year Built
2011
Length
18.5 m (60.7 ft)
Max Span
16.7 m
Width
18.8 m (61.7 ft)
Lanes
3
Daily Traffic
6,833
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.