I-69 SB over WEAVER DITCH

03.55 N SR 58 · County 027, Indiana · Built 2012 · 2 Lanes · 6,837 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
080328
Year Built
2012
Length
29.5 m (96.8 ft)
Max Span
28.9 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
6,837
Material
Prestressed Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.